![](https://dyse.com/wp-content/uploads/2023/06/Reduced-IMG_1341-1-1024x768.jpg)
Cringle Road Site Visit
Published on June 16, 2023
Earlier this week, some of our buildings team visited our Cringle Road development. The scheme brings 57 houses to the area. We undertook civil and structural design of the entire scheme including the houses, private drainage, SuDS, S104 drainage, S38 roads and S278 works. A huge thanks to our client Towerhouse Systems who gave us an enthusiastic tour of the entire scheme.